A 5 MW plant on the factory site supplying stable power to the production lines.
IDEM’s 5 MW power plant was built on the factory site and supplies stable power to the production lines. Its capacity and operation were reviewed during a visit by the managing director of the Tabriz power distribution company.
Comments (1)
خبر خوبی بود؛ موفق باشید.