Skip to main content

Image and video gallery

Gallery

  • Engine assembly line
    Engine assembly lineFinal assembly of 400 series engines.
  • Machining line
    Machining lineCylinder block machining on CNC centres.
  • Engines ready for delivery
    Engines ready for deliveryTested engines before packing.
  • Cylinder block
    Cylinder blockA cylinder block after machining, before assembly.
  • Engine test bench
    Engine test benchPower and torque testing before delivery.
  • Test cell
    Test cellOne of the engine test laboratory cells.
  • Quality inspection
    Quality inspectionParts inspection in quality control.
  • OM 355 common-rail engine
    OM 355 common-rail engineThe common-rail OM 355 to Euro 5 EEV.
  • IDEM plant entrance
    IDEM plant entranceThe plant entrance on Dizelabad Road, Tabriz.
  • Launch of the OM 457 Euro 5 line
    Launch of the OM 457 Euro 5 lineCeremony marking the start of OM 457 Euro 5 EEV production.
  • The first locally made cylinder blocks
    The first locally made cylinder blocksFrom the plant's photo archive.
  • 5 MW power plant
    5 MW power plantDiesel gensets of IDEM's 5 MW power plant.
  • Introducing the OM 457 Euro 5 EEV
    Introducing the OM 457 Euro 5 EEVProduct film
  • Engine testing in the reference laboratory
    Engine testing in the reference laboratoryA performance test on film
  • A tour of the IDEM plant
    A tour of the IDEM plantFrom the plant gate to the assembly line